What is 4CP and how can Texas businesses reduce 4CP charges?

Four‑coincident‑peak (4CP) charges are a transmission cost allocation that reflects a customer’s share of the most congested 15‑minute intervals during the summer. By understanding how those peaks are selected and using demand‑side tools, Texas C&I firms can shave dollars off next year’s transmission bill, though the effort must be weighed against operational impact.

By UPG Market Desk — Texas Commercial Energy Consultants•Published November 19, 2026•6 min read

The core truth about 4CP

Four‑coincident‑peak (4CP) transmission charges are not a vague surcharge; they are a direct allocation of the cost of the most congested 15‑minute intervals on the ERCOT grid during the four summer months (June‑September). If your facility’s demand spikes during any of those intervals, ERCOT assigns a proportional share of the transmission upgrade and congestion costs to you for the next fiscal year. The answer to the headline question is simple: know when the peaks occur, shape demand away from them, and you will reduce the charge.

Understanding how 4CP is calculated

The four summer peaks

ERCOT runs a 15‑minute market called the nodal market. For each of the four summer months it identifies the single 15‑minute interval with the highest system‑wide congestion cost – the “coincident peak.” Those four intervals become the reference points for the 4CP charge. The intervals are published after the season ends and are used to calculate each customer’s share for the upcoming year.

Your site’s share

ERCOT measures each customer’s demand at the point of interconnection (POI) for every 15‑minute interval. Your 4CP allocation equals the sum of your demand during the four identified intervals divided by the total system demand in those same intervals, multiplied by the total transmission cost pool (approximately $1.2 billion annually). In practice, a 1 MW demand during a peak interval can add $2,500‑$3,500 to your next‑year bill, depending on the congestion level.

Why the focus on summer

Summer is when ERCOT’s transmission system is most stressed due to air‑conditioning load. The 4CP mechanism was created to ensure that those who contribute most to peak congestion pay a fair share of the upgrades needed to keep the grid reliable.

Reducing your 4CP exposure

Prediction services

Accurate forecasting is the first line of defense. UPG’s Energy Health Check includes a 15‑minute load‑profile audit that pinpoints when your demand aligns with historical 4CP intervals. By overlaying weather forecasts, production schedules, and known demand‑response events, you can predict with 80‑90% confidence whether a given day will contribute to the next year’s 4CP pool.

Load shifting and curtailment

  1. Shift non‑critical processes – Move HVAC pre‑cooling, batch production, or water‑treatment cycles to early morning or late evening when the system is less congested. A 500 kW shift for just two 15‑minute intervals can shave roughly $1,200 off the 4CP charge.
  2. Automated demand‑response (DR) – Deploy a DR controller that receives ERCOT’s real‑time price signal (LMP) and automatically curtails load when the LMP exceeds $30 /MWh during a peak interval. UPG’s clients have saved an average of 12% on 4CP‑related costs by using such systems.
  3. On‑site generation – Adding a 1 MW solar array with a battery that discharges during the identified peak windows can offset the peak demand entirely, eliminating the associated 4CP charge for that interval.

Contractual hedges

While 4CP is a transmission cost, some REPs offer “4CP‑linked” fixed‑rate contracts that include a built‑in hedge against anticipated peak charges. These contracts typically lock the 4CP component at a rate 5‑10% below the projected ERCOT average, providing budgeting certainty.

When the pain outweighs the gain

Chasing 4CP can be operationally intensive. If your facility’s peak demand is already below 2 MW and the 4CP intervals represent less than 0.5% of annual consumption, the potential savings may be under $5,000 per year—often less than the cost of a sophisticated DR system or the labor to re‑schedule production. In such cases, UPG recommends focusing on broader demand‑charge reduction strategies instead of a laser‑focused 4CP campaign.

UPG’s role in 4CP management

United Power Group (UPG) brings 25+ years of Texas market expertise to the table. With a panel of 30+ top‑tier suppliers and a track record of delivering up to 27% spend reduction, we help clients navigate the 4CP landscape through:

  • Free Energy Health Check – A bill review and TDSP delivery‑charge audit that surfaces hidden 4CP exposure.
  • Custom forecasting models – Built on ERCOT’s LMP data, weather patterns, and your historical load profile.
  • Implementation support – From DR controller selection to on‑site generation sizing, we ensure the solution aligns with your operational constraints. Our portfolio of 8,000+ business customers collectively saves $3.2 M annually, and many of those savings come from disciplined 4CP management.

Bottom line

4CP charges are a transparent, usage‑based allocation of Texas transmission costs tied to the four most congested summer intervals. By identifying those intervals, forecasting demand, and applying targeted load‑shifting, DR, or on‑site generation, a Texas business can reduce its 4CP bill by tens of thousands of dollars. However, the effort must be justified by the size of the peak demand and the cost of the mitigation tools. UPG’s free Energy Health Check is the fastest way to determine whether a 4CP strategy makes financial sense for your operation.

What is 4CP and how can Texas businesses reduce 4CP charges? — quick questions

More articles

What is 4CP and how can Texas businesses reduce 4CP charges?

Four‑coincident‑peak (4CP) transmission charges are a cost‑allocation method that ties a commercial or industrial customer’s bill to the four highest summer demand intervals on the ERCOT grid. Understanding how those peaks are selected, how your site’s share of each 15‑minute interval is measured, and which operational levers actually move the needle can shave tens of thousands of dollars off a Texas‑based electricity bill. UPG’s data‑driven approach shows where the savings are real and where the effort outweighs the benefit.

Can Texas businesses earn money from demand response in ERCOT?

Texas commercial and industrial customers can turn load reductions into a revenue stream by participating in ERCOT’s demand‑response programs. By understanding the mechanics of Emergency Response Service, 4CP avoidance, ancillary market participation, and aggregator relationships, firms can assess whether the required operational changes are worthwhile. The article outlines typical payments, eligibility criteria, and the types of facilities that are strong candidates versus those that should pass.

Demand charges and load factor: how Texas facilities cut both

Demand charges are billed on peak kW, while energy charges are billed on total kWh. A low load factor means the peak is much higher than the average, inflating demand costs. By staggering equipment, shaving peaks, shifting loads, and using real‑time monitoring, Texas facilities can raise their load factor and cut both demand and energy bills.

Ready to take control of your energy costs?

Send one recent bill and a UPG advisor will run your free Energy Health Check — TDSP fees, contract terms, renewal windows — with a written summary back to you.