4CP (Four Coincident Peaks) is a transmission cost allocation that ties a commercial or industrial customer’s bill to its share of the four highest summer grid peaks in ERCOT. By understanding how those peaks are identified and using predictive analytics, load‑shifting and targeted curtailment, Texas firms can trim next‑year transmission charges, though the effort must be weighed against operational impact.
4CP is a transmission cost allocation that charges commercial and industrial (C&I) customers based on their share of the four highest coincident summer peaks on the ERCOT grid; reducing those peaks can cut next year’s transmission bill. For most Texas businesses the 4CP component can represent 10‑20% of the total transmission charge, so even a modest reduction in peak share can translate into thousands of dollars saved annually.
In short, ERCOT identifies the four 15‑minute intervals between June and September when the grid’s overall load is highest. Your facility’s contribution to the load during each of those intervals is measured in kilowatts, summed, and expressed as a percentage of the total ERCOT load for that interval. That percentage is applied to the total 4CP transmission cost pool, which is then allocated to your bill for the following year. The mechanics are fixed, but the opportunity to influence the outcome is real.
Understanding 4CP
How ERCOT identifies the four peaks
ERCOT’s nodal market publishes real‑time locational marginal prices (LMP) and system load every five minutes. For the summer transmission season (June 1 – Sept 30) ERCOT extracts the 15‑minute intervals with the highest system‑wide MW. The four intervals with the greatest MW constitute the "Four Coincident Peaks." Because the grid is operated on a nodal basis, the LMP at each node reflects congestion and loss factors, but the 4CP pool is calculated on the aggregate system load, not on individual node prices.
How charges are calculated
The Texas Public Utility Commission (PUCT) sets the total 4CP transmission cost pool each year based on ERCOT’s cost‑of‑service filing. The pool is then allocated to each Transmission and Distribution Service Provider (TDSP) – Oncor, CenterPoint, AEP Texas, TNMP – according to the TDSP’s share of the system load. Finally, each TDSP distributes its share to its customers using the formula:
Customer 4CP charge = (Customer MW during each peak / Total ERCOT MW during that peak) × TDSP 4CP pool
If a customer contributes 0.05% of the load during a peak, it pays 0.05% of the TDSP’s 4CP pool. With the 2024 pool estimated at roughly $350 million, a 0.05% share equals about $175,000 – a significant line item for a mid‑size manufacturer.
Strategies to lower your 4CP share
Predictive analytics and the Energy Health Check
UPG’s free Energy Health Check reviews your most recent bill and audits TDSP delivery‑charge allocations. Our analysts overlay your historical demand profile with ERCOT’s 4CP intervals to pinpoint the exact 15‑minute windows where you are most exposed. By forecasting weather, production schedules and market LMP trends, we can model how a 5‑10% demand reduction during those windows would affect your 4CP percentage.
Load shifting and block contracts
Fixed‑rate block contracts allow you to purchase a defined kW block at a locked price. By aligning that block with the identified 4CP intervals, you can shift discretionary processes – such as refrigeration defrost cycles, HVAC pre‑cooling, or non‑critical batch runs – to off‑peak hours. A 1 MW shift during a 15‑minute peak can shave roughly 0.03% off your 4CP share, which, in the example above, saves about $105 annually per 0.01% reduction.
Demand response and curtailment
Participating in ERCOT’s ancillary services market (e.g., Regulation Service) or enrolling in a TDSP‑run demand‑response program provides a financial incentive for real‑time curtailment. When a 4CP interval approaches, an automated control system can drop non‑essential loads by 200‑500 kW for the 15‑minute window, earning a response payment while simultaneously reducing your 4CP allocation.
Energy storage as a peak‑shaving tool
Battery storage sized to deliver 500 kW for 30 minutes can cover the entire 15‑minute 4CP interval and provide a buffer for post‑peak rebound. At a capital cost of $150/kWh, a 1 MWh system pays for itself in 4‑6 years when the combined savings from 4CP reduction, demand‑charge avoidance, and ancillary service payments are accounted for.
When chasing 4CP isn’t worth it
Not every facility benefits equally. If your load factor is already high (above 80%) and your peak demand is less than 10% of the system peak, the marginal cost of curtailment – lost production, wear‑and‑tear, staffing – may exceed the dollar savings. Likewise, businesses with rigid process constraints (continuous casting, data‑center uptime) may find the operational pain outweighs a potential 0.01%‑0.02% reduction in 4CP share. In those cases, focusing on demand‑charge optimization or negotiating a better fixed‑rate block may deliver a higher ROI.
Role of a procurement partner
Free Energy Health Check
Our Energy Health Check is a no‑cost, no‑obligation review that audits your bill, validates TDSP delivery‑charge calculations, and maps your demand profile against the 4CP intervals. For the 8,000+ business customers we serve, the average client discovers $12,000‑$45,000 of avoidable 4CP‑related spend in the first year.
Leveraging UPG expertise
With 25+ years of Texas market experience, a 30‑plus supplier panel, and a track record of delivering up to 27% total spend reduction, UPG can:
- Build a customized 4CP reduction roadmap that aligns with your production schedule.
- Negotiate block‑and‑index contract structures that lock in a lower fixed‑rate while preserving flexibility for peak‑shaving.
- Integrate third‑party demand‑response aggregators and storage providers into a single, audited contract.
- Monitor ERCOT’s real‑time LMP and 4CP forecasts to trigger automated curtailment when the cost benefit exceeds a pre‑set threshold.
Bottom line
4CP charges are a predictable, formula‑driven portion of your transmission bill, but they are not immutable. By identifying the exact 15‑minute intervals that drive your allocation, applying predictive analytics, and using load‑shifting, demand‑response or storage strategically, Texas businesses can reduce their 4CP share and protect the bottom line. However, the effort must be justified against operational constraints; for many firms the sweet spot lies in modest demand‑reduction during the four peaks, supported by a professional Energy Health Check and a seasoned procurement partner like United Power Group.
What is 4CP and how can Texas businesses reduce 4CP charges? — quick questions
More articles
What is 4CP and how can Texas businesses reduce 4CP charges?
Four‑coincident‑peak (4CP) charges are a transmission cost allocation that reflects a customer’s share of the most congested 15‑minute intervals during the summer. By understanding how those peaks are selected and using demand‑side tools, Texas C&I firms can shave dollars off next year’s transmission bill, though the effort must be weighed against operational impact.
What is 4CP and how can Texas businesses reduce 4CP charges?
Four‑coincident‑peak (4CP) transmission charges are a cost‑allocation method that ties a commercial or industrial customer’s bill to the four highest summer demand intervals on the ERCOT grid. Understanding how those peaks are selected, how your site’s share of each 15‑minute interval is measured, and which operational levers actually move the needle can shave tens of thousands of dollars off a Texas‑based electricity bill. UPG’s data‑driven approach shows where the savings are real and where the effort outweighs the benefit.
Can Texas businesses earn money from demand response in ERCOT?
Texas commercial and industrial customers can turn load reductions into a revenue stream by participating in ERCOT’s demand‑response programs. By understanding the mechanics of Emergency Response Service, 4CP avoidance, ancillary market participation, and aggregator relationships, firms can assess whether the required operational changes are worthwhile. The article outlines typical payments, eligibility criteria, and the types of facilities that are strong candidates versus those that should pass.
Ready to take control of your energy costs?
Send one recent bill and a UPG advisor will run your free Energy Health Check — TDSP fees, contract terms, renewal windows — with a written summary back to you.