What is 4CP and how can Texas businesses reduce 4CP charges?

Four‑coincident‑peak (4CP) transmission charges are the biggest demand‑related expense for most Texas commercial and industrial customers. Understanding how ERCOT identifies the four summer peaks, how those intervals set next‑year’s transmission bill, and which operational levers actually move the needle can save firms tens of thousands of dollars annually. This guide explains the mechanics, the realistic reduction strategies, and when the effort outweighs the benefit.

By UPG Market Desk — Texas Commercial Energy Consultants•Published November 24, 2026•6 min read

The bottom line: 4CP is a cost you can influence, but only with the right data and disciplined load management.

Four‑coincident‑peak (4CP) transmission charges are the single largest demand‑related line item on most Texas C&I electricity bills. In ERCOT’s 2023‑2024 planning year the average 4CP charge for a 500 kW customer was $12.40 per kW‑month, roughly 30 % of the total transmission bill. By shaping load away from the four summer peak intervals, a midsize manufacturer can shave $10 k‑$30 k off its annual transmission expense. The key is to know which 15‑minute intervals matter, how your share is calculated, and which levers move the needle without hurting production.

What is 4CP?

ERCOT defines 4CP as the average of a customer’s demand during the four highest‑demand 15‑minute intervals that occur during the summer peak window (June 1 – September 30). The grid operator first identifies the system‑wide four coincident peaks – the 15‑minute slots when overall ERCOT load is highest. Those four slots become the “benchmark” for the planning year. Each customer’s demand during those exact intervals is measured, summed, and divided by four to produce the 4CP demand value (in kW). That value is multiplied by the 4CP transmission rate set by the Public Utility Commission of Texas (PUCT) and appears on the next year’s bill as a separate line item.

How the four summer peaks are chosen

  1. System‑wide load data – ERCOT publishes real‑time and historical load data for every 15‑minute interval. The summer peak window is fixed by the PUCT.
  2. Four highest intervals – ERCOT scans the window and selects the four intervals with the greatest total system load. In recent years the peaks have clustered around late July and early August, often coinciding with heat‑driven air‑conditioning load.
  3. Public posting – The identified intervals are posted on ERCOT’s website after the planning year closes, giving customers a clear target for the next year.

Because the intervals are fixed for the entire planning year, a customer’s 4CP charge is a function of when you consume, not how much you consume overall. A plant that runs a constant 400 kW may pay more than a plant that peaks at 600 kW but shifts that load out of the four benchmark slots.

Why 4CP matters for your bottom line

The 4CP charge is a capacity cost, not an energy cost. It is calculated in $/kW‑month and is applied before any energy (cents/kWh) or demand‑charge (cents/kW) components from the TDSP. For many Texas businesses the 4CP line accounts for 20‑35 % of the total transmission bill, which translates to $5 k‑$50 k annually depending on size and load profile. Reducing 4CP does not lower your energy rate, but it directly reduces the fixed transmission expense that is passed through by the TDSPs (Oncor, CenterPoint, AEP Texas, TNMP).

Proven ways to lower 4CP charges

1. Load‑forecasting and predictive analytics

Accurate forecasting of the four benchmark intervals is the foundation of any 4CP strategy. UPG’s Energy Health Check includes a 4CP audit that maps your historical demand against the published ERCOT peaks and runs a Monte Carlo simulation to estimate the probability of hitting each interval. Clients that adopt a data‑driven forecast typically achieve a 5‑10 % reduction in 4CP demand, equating to $3 k‑$8 k saved per year for a 300 kW site.

2. Real‑time load shifting

If your process can be delayed by 15‑30 minutes without impacting output, you can move that load out of a peak interval. Modern PLCs and SCADA systems can be programmed to receive the ERCOT peak schedule (published a few weeks in advance) and automatically throttle non‑critical loads. In practice, a 50 kW refrigeration load shifted for two of the four intervals saved a 250 kW manufacturer about $2 k in 4CP charges.

3. Demand‑response enrollment

Participating in ERCOT’s ancillary services market (e.g., Regulation Service or Emergency Response Service) can earn revenue while simultaneously reducing 4CP exposure. When you curtail during a market event that coincides with a 4CP interval, the curtailment is recorded as reduced demand for that interval, directly lowering the 4CP calculation.

4. Strategic equipment scheduling

Large motors, compressors, and water‑treatment pumps often run on fixed schedules. By staggering start‑up times so that no more than a predetermined kW threshold is added during the four benchmark slots, you can keep your 4CP demand below the next tier of the PUCT‑approved transmission rate schedule. UPG’s consultants have helped a Texas food‑processing plant restructure its shift schedule, resulting in a 12 % drop in 4CP demand and a $6 k annual savings.

5. Energy storage and on‑site generation

Battery storage can be dispatched specifically to shave demand during the four peak intervals. A 250 kWh battery with a 150 kW discharge capability can offset a portion of the 4CP demand for each interval, effectively “buying” lower transmission rates for the next year. The economics depend on the storage cost and the marginal 4CP rate, which currently averages $12‑$15 per kW‑month.

When chasing 4CP isn’t worth it

Not every facility benefits from aggressive 4CP management. Consider the following signals:

  • Low marginal 4CP rate – If the PUCT‑approved rate for your demand tier is below $8/kW‑month, the dollar impact of a 5 kW reduction is less than $400 per year, often not justifying the operational complexity.
  • High production constraints – Industries with continuous processes (e.g., steel rolling) cannot shift load without costly downtime. The opportunity cost of lost production usually outweighs the transmission savings.
  • Limited visibility – If you lack real‑time metering or SCADA integration, the risk of unintentionally exceeding the benchmark intervals increases, potentially leading to penalties.
  • Short‑term tenancy – For a tenant expecting to vacate within a year, the amortized benefit of 4CP reduction may be negligible.

In these scenarios, a pragmatic approach is to accept the baseline 4CP charge and focus on other cost levers such as energy‑rate negotiation, demand‑charge optimization, or fixed‑rate contracts.

How United Power Group can help

UPG brings 25 + years of Texas market expertise to the 4CP challenge. Our headquarters in Lewisville, Texas, serves over 8,000 business customers, delivering an average of $3.2 M in annual savings across the portfolio. Through our free Energy Health Check we audit your bill, verify TDSP delivery‑charge allocations, and run a dedicated 4CP analysis. Our consultants then design a roadmap that may include:

  • Forecasting the next year’s four ERCOT peaks.
  • Installing automated load‑shifting controls.
  • Enrolling in ERCOT ancillary‑service programs.
  • Evaluating the ROI of battery storage or on‑site generation.

Clients who implement our recommended 4CP plan typically see a 7‑15 % reduction in transmission spend, translating to $5 k‑$45 k saved per year for mid‑size firms. Because we work with a 30‑plus top‑tier supplier panel, we can also align your contract structure (fixed‑rate or block & index) to lock in lower transmission exposure.

Bottom line

4CP charges are a predictable, repeatable cost that can be managed through data‑driven forecasting, targeted load shifting, and strategic participation in ERCOT’s ancillary markets. The effort is justified when the marginal 4CP rate is high enough to offset the operational expense of shifting load or deploying storage. For most Texas C&I customers, a disciplined 4CP program delivers measurable savings and improves overall transmission cost visibility. Start with UPG’s free Energy Health Check to quantify your exposure and map a practical reduction path.

What is 4CP and how can Texas businesses reduce 4CP charges? — quick questions