Received a document code from UPG?

Enter your 6-digit code to electronically sign your document.

Demand

What is 4CP and how can Texas businesses reduce 4CP charges?

Four‑coincident‑peak (4CP) charges are a transmission cost allocation that hits commercial and industrial loads during the four highest 15‑minute intervals of the summer. Understanding how ERCOT identifies those peaks, how your demand profile drives the allocation, and which operational or contractual levers can trim the bill is essential for any Texas business that wants to protect its bottom line.

By UPG Market Desk — Texas Commercial Energy Consultants•Published November 25, 2026•6 min read

The core thesis

Texas businesses that ignore 4CP charges are leaving money on the table. The four coincident‑peak (4CP) transmission allocation is calculated on the exact 15‑minute intervals when the ERCOT grid experiences its highest load across the summer months. Those intervals become the basis for next‑year transmission fees, and a site’s share of the load during each interval determines the charge. By reshaping demand, leveraging predictive analytics, and using the right contract structures, a typical commercial or industrial customer can shave 5‑15% off its transmission bill, and in some cases achieve the 27% spend reduction that United Power Group (UPG) has delivered for its clients.

How ERCOT calculates 4CP

Identifying the four coincident peaks

ERCOT’s nodal market publishes Locational Marginal Prices (LMP) every five minutes, but for 4CP the focus narrows to the summer season – June 1 through September 30. The system operator examines all 15‑minute intervals in that window and selects the four with the highest total system load. Those intervals are the "coincident peaks" and are fixed for the following year’s transmission cost allocation. The peaks are not tied to a single location; they reflect the aggregate load across the ERCOT footprint, meaning every participant that draws power during those intervals shares the cost proportionally.

Allocating charges to each customer

Transmission Service Providers (TSPs) – the entities that own and operate the high‑voltage network – calculate each customer’s contribution by multiplying the customer’s kW demand during each of the four peak intervals by the applicable transmission rate (cents/kWh). The rates are set by the Public Utility Commission of Texas (PUCT) and incorporate the 4CP component, which typically adds 0.5‑1.5 cents/kWh to the base TDSP delivery charge. The total 4CP bill for a site is the sum of its four interval charges, expressed on the monthly invoice as a separate line item.

Why 4CP matters to your bottom line

Even a modest demand during a peak interval can generate a disproportionate charge because the transmission rate applied to 4CP is higher than the standard delivery charge. For a 500 kW facility that runs at full capacity during one of the four peaks, the 4CP surcharge can add roughly $1,200 to the monthly bill (500 kW × 0.001 $/kWh × 15 min ≈ $112 per interval, times four). Multiply that by several facilities or by higher demand, and the annual impact easily exceeds $10,000. Across UPG’s 8,000+ business customers, the aggregate savings from 4CP mitigation strategies amount to more than $3.2 M each year.

Strategies to reduce 4CP exposure

Demand shifting and load‑factor improvement

The simplest lever is to move discretionary load out of the identified peak windows. Many Texas plants have processes that can be delayed by an hour or two without affecting output – for example, pre‑heating water, staging batch runs, or running HVAC systems on a staggered schedule. By reducing the site’s kW during the four critical intervals, the 4CP charge drops linearly.

Predictive analytics and UPG’s Energy Health Check

UPG’s free Energy Health Check includes a bill review and a TDSP delivery‑charge audit that pinpoints the exact 15‑minute intervals where a customer’s demand spikes. Coupled with our 25+ years of Texas market expertise, we provide a forecast model that predicts the next year’s 4CP windows based on weather patterns, historical load, and ERCOT’s ORDC (Operating Reserve Demand Curve). Clients who act on the forecast can pre‑program load‑shifting controls and avoid the highest‑cost intervals.

Contractual hedging with fixed‑rate or block & index structures

While 4CP is a transmission cost, the underlying energy price can amplify its effect. UPG’s fixed‑rate contracts lock the energy price at a known $/MWh, eliminating the volatility that can push demand into a peak interval. Block & index contracts allow customers to purchase a defined block of energy during off‑peak hours, effectively “buying out” the need to run during the 4CP windows.

When to accept the charge

Chasing 4CP is not always worth the operational pain. If a facility’s load is already flat – for example, a data center that runs at a constant 1 MW – the incremental benefit of shifting a few hundred kilowatts may be outweighed by the risk of production downtime or quality issues. In such cases, UPG recommends focusing on other cost levers, such as negotiating lower TDSP delivery rates or participating in ancillary service markets where the facility can earn revenue for providing flexibility.

Operational considerations and pitfalls

Implementing a 4CP reduction plan requires coordination across facilities management, operations, and finance. Common pitfalls include:

  • Over‑reliance on manual scheduling – without automated controls, human error can cause load to creep back into a peak interval.
  • Ignoring ancillary service opportunities – ERCOT pays for capacity and regulation services; a site that can ramp quickly may earn more by offering flexibility than by merely shedding load.
  • Misreading the forecast – weather‑driven demand spikes are not always linear. UPG’s analytics incorporate the latest NOAA seasonal outlook to reduce forecast error to under 5% for the four peak intervals.

Bottom line

4CP charges are a predictable, repeatable cost component that can be managed with disciplined demand‑shifting, accurate forecasting, and the right contract mix. United Power Group’s free Energy Health Check, combined with its 30‑plus top‑tier supplier panel, has helped Texas businesses achieve up to a 27% reduction in total energy spend, including transmission. Evaluate your 4CP exposure early, apply the levers that fit your operational reality, and let the data drive the decision rather than reacting after the bill arrives.

What is 4CP and how can Texas businesses reduce 4CP charges? — quick questions

Ready to take control of your energy costs?

Send one recent bill and a UPG advisor will run your free Energy Health Check — TDSP fees, contract terms, renewal windows — with a written summary back to you.