What is 4CP and how can Texas businesses reduce 4CP charges?

Four‑coincident‑peak (4CP) transmission charges are a hidden cost for Texas C&I customers, calculated from a site’s share of the four highest summer demand intervals. Understanding how ERCOT identifies those peaks, how the allocation works, and which demand‑management tools actually move the needle can shave millions off a utility bill. This guide walks through the mechanics, prediction services, curtailment options, and the point at which chasing 4CP becomes uneconomical.

By UPG Market Desk — Texas Commercial Energy Consultants•Published November 26, 2026•6 min read

Core thesis

Four‑coincident‑peak (4CP) transmission charges can add up to 10‑15% of a Texas commercial or industrial electricity bill, yet many CFOs treat them as a fixed line item. In reality, 4CP is a usage‑based charge that reflects a customer’s share of the four highest 15‑minute demand intervals across the ERCOT summer (June‑September). By understanding the allocation methodology and applying targeted demand‑management tactics, a Texas business can reduce its 4CP exposure and improve overall cost predictability.

How ERCOT defines the 4CP

ERCOT’s transmission cost allocation follows the "four coincident peak" methodology mandated by the Public Utility Commission of Texas (PUCT). The process has three key steps:

Identifying the four peaks

During each summer season, ERCOT monitors the system every 15 minutes and records the total megawatt (MW) load on the grid. The four 15‑minute intervals with the highest aggregate demand become the "coincident peaks." These intervals typically fall in late July and early August, but exact timing varies year‑to‑year based on weather and load patterns.

Calculating a customer’s share

Each TDSP (Oncor, CenterPoint, AEP Texas, TNMP) receives the total 4CP charge from the PUCT and allocates it to its customers based on two components:

  1. Demand contribution – the proportion of a customer’s kW during each of the four peak intervals relative to the TDSP’s total demand in that interval.
  2. Load factor adjustment – a small factor that rewards customers with a higher average load factor (kWh/kW) across the summer. The result is a dollar amount per kW that appears on the next year’s transmission line on the bill.

When the charge is posted

The 4CP allocation for a given summer is finalized in the fall and appears on the next year’s bill as a "Transmission – 4CP" line item, expressed in cents/kWh or $/kW depending on the TDSP’s format.

Why 4CP matters for your bottom line

For a 5 MW facility with a 4CP rate of $12/kW, the annual charge is roughly $60,000. Multiply that by a 30‑year asset life and the cumulative impact exceeds $1.5 M. UPG’s experience with 8,000+ business customers shows that targeted 4CP reductions can contribute up to 27% of total spend reduction, translating into an average $3.2 M saved per client each year.

Strategies to reduce 4CP exposure

Predictive analytics and demand forecasting

UPG’s Energy Health Check includes a 15‑minute interval demand model that projects a site’s likely share of the four peaks. By overlaying weather forecasts, production schedules, and historical load curves, the model identifies "high‑risk" intervals weeks in advance. Customers can then pre‑emptively adjust processes or shift non‑critical loads.

Load shifting and curtailment

When a peak interval is forecast, the most cost‑effective response is to shift discretionary load to off‑peak hours. Examples include:

  • Rescheduling HVAC pre‑cooling to early morning.
  • Running batch processes on evenings or weekends.
  • Using on‑site storage or backup generators to shave a few hundred kilowatts during the 15‑minute window. A modest 5% reduction in peak‑interval demand can lower the 4CP charge by 3‑5%, often outweighing the operational inconvenience.

Contractual tools

Fixed‑rate contracts with block or index structures can lock in a lower transmission component, but they do not eliminate the 4CP allocation, which remains a separate line item. However, a well‑structured contract can provide cash‑flow certainty while you work on demand‑side reductions.

When chasing 4CP isn’t worth it

If a facility’s peak demand is already below the 4CP threshold (e.g., under 1 MW for a small office park) or if the cost of curtailment exceeds the expected savings, the effort may not justify the return. Likewise, highly variable processes—such as continuous steel rolling—may incur excessive wear and productivity loss for marginal 4CP gains. In those cases, focus on broader energy procurement strategies, where UPG’s 30+ top‑tier supplier panel can achieve up to 27% spend reduction.

Bottom line

4CP charges are a calculable, not immutable, cost. By leveraging ERCOT’s transparent peak‑identification process, applying predictive demand analytics, and executing targeted load‑shifting or storage strategies, Texas businesses can trim a significant portion of their transmission bill. UPG’s free Energy Health Check and 25 + years of Texas market expertise make it straightforward to quantify the upside and decide when the operational trade‑off is worthwhile.

What is 4CP and how can Texas businesses reduce 4CP charges? — quick questions